Key terms used throughout Productivity Workbench and this documentation.

ART (Agile Release Train)
A long-lived team of teams that plans, commits, and executes together in a PI. Enterprise / SAFe
Burndown
A chart showing the remaining story points in a sprint over time. Ideal and actual lines diverging early is a planning risk signal.
Capacity
The total story points a team can deliver in a sprint, based on headcount, working days, and any planned leave.
Cost of Delay (CoD)
The economic impact of not delivering a feature. Used in WSJF scoring (Business Value + Time Criticality + Risk Reduction).
Definition of Done (DoD)
The agreed checklist of criteria a story or feature must meet before it can be considered complete.
Definition of Ready (DoR)
The agreed checklist of criteria a story must meet before it can be committed to a sprint.
Epic
A large body of work (typically 3—6+ months) that delivers one or more Outcomes. Epics decompose into Features. Business+
Feature
A deliverable slice of product functionality with clear acceptance criteria. Features decompose into Stories. The core entity on the Free tier.
Outcome
A measurable business result beneath the Vision. Outcomes drive Epics and Features. Business+
PI (Programme Increment)
A SAFe time-box, typically 8—12 weeks, containing 4—6 sprints. PI Planning aligns all teams to a shared set of objectives. Enterprise / SAFe
Sprint
A time-boxed delivery cycle, typically 1—3 weeks. A sprint contains a goal, a set of committed stories, and ends with a review and retrospective.
Story / Work Item
The smallest independently deliverable unit of user-facing work. Can be a User Story, Bug, Spike, or Tech Debt entry.
Workspace
An isolated environment for a team or organisation within Productivity Workbench. All data is scoped to a workspace.
Triage
The structured session where incoming requests are assessed, scored, and either accepted into the backlog, deferred, or rejected. Business+
Velocity
The average number of story points delivered per sprint over a rolling window. Used to forecast future delivery capacity.
Vision
The highest-level strategic statement describing the product's purpose and long-term ambition. Business+
WSJF (Weighted Shortest Job First)
A lean-agile prioritisation model. WSJF = Cost of Delay — Job Duration. Higher score = deliver sooner. Business+
Cadence
A regular, predictable rhythm of events — sprint ceremonies, PI Planning, demos, retrospectives. Consistent cadence reduces planning overhead and creates a steady flow of delivery.
Cycle Time
The elapsed time from when work starts on an item to when it is delivered. Shorter cycle times indicate a healthy, low-WIP flow. Tracked on the Flow Metrics report. Business+
Lead Time
The elapsed time from when an item is requested (or enters the backlog) to when it is delivered. Lead time includes queue time; cycle time begins only when work starts. Business+
Throughput
The number of items (stories or features) completed per sprint or time period. A key flow metric alongside cycle time and WIP. Business+
WIP (Work In Progress)
Items that have been started but not yet completed. High WIP inflates cycle time and increases context switching. WIP limits on Kanban boards enforce discipline. Business+
OKR (Objectives & Key Results)
A goal-setting framework where an Objective describes a qualitative aspiration and Key Results are measurable milestones that indicate whether the objective has been achieved. Business+
Intent (AI Product Studio)
A captured piece of work input — an opportunity, bug, spike, tech-debt item, idea, or outcome — that can be shaped, prioritised, and dispatched to an AI agent for elaboration or implementation. Enterprise
Kanban
A visual workflow management method using a board with columns representing stages of work. Cards move from left to right as work progresses. WIP limits prevent bottlenecks from building up unnoticed.
PPM (Programme Predictability Measure)
A SAFe metric: the ratio of actual business value achieved to planned business value across all PI Objectives. An ART targeting 80—100% is considered healthy. Enterprise / SAFe
Release Train Engineer (RTE)
The chief Scrum Master for an ART. The RTE facilitates ART events, coaches teams, escalates impediments, and drives relentless improvement across the train. Enterprise / SAFe
Value Stream
The end-to-end series of steps an organisation uses to deliver a product or service. In SAFe, budgets are allocated to Value Streams rather than projects, giving teams funding continuity and autonomy. Enterprise / SAFe